One of the three coordinator disks needs to be repurposed as a data disk. What can the administrator do to accommodate growth in the data center and still provide SCSI-3 I/O fencing?
An administrator is manually adding a node named sym3 to an existing two-node cluster. What must be done after installing Veritas Cluster Server and configuring cluster communications on the new node?
An administrator is responsible for a cluster split between two data centers in different locations. The data is mirrored between the two sites. If the administrator would like to set up I/O fencing, how should the configuration be deployed to maximize resilience?
While in jeopardy, the node with the online websg service group crashes. Which websg attribute is set on the surviving systems if I/O fencing is yet to be configured?
Which command allows the administrator to leave services currently under Veritas Cluster Server control in a running state while performing configuration changes?