1.
The Lean Principle action in the 5S approach that deals with having those items needed regularly at hand and those items need less regularly stored out of the way is known as ___________.
2.
SPC on the outputs is more preferred than SPC on the inputs when implementing SPC for your process.
3.
Significant variation in process performance is a consequence of several causes that can be classified using which of the terminologies shown. (Note: There are 2 correct answers).
4.
When it comes to Control one of the most effective means of eliminating defects is to _________________ .
5.
If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?
6.
After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?
7.
A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?
8.
When analyzing a data set we frequently graph one metric as a function of another. If the slope of the Correlation line is -2.5 we would say the two metrics are ___________ correlated?
9.
Multiple Linear Regressions (MLR) is best used when which of these are applicable? (Note: There are 3 correct answers).
10.
Fractional Factorial designs for an experimental approach are used when ____________ about the multiple metric interaction in a process.