1.
A CIO needs a solution which allows for business-driven policies to deliver resources based on time, cost, and service-level requirements. Making workloads independent of hardware resources and
simplifying IT infrastructure management are crucial. What Power Systems solution should be recommended?
2.
What is the purpose of the MES roadmap?
3.
Which of the following explains IBM i optimization features when compared to Windows?
4.
A customer wants to consolidate their existing 2-core 520 and two x86 Linux-based Web servers onto a 4-core Power 720 to improve efficiency and position the company for future growth. Which of the
following benefits will have the greatest effect on ROI?
5.
A customer using a 3995 Optical Library for storing 105GB of accounts receivable invoice data plans to migrate to a new Power Systems server. The customer wants this imaging workload migrated to the new system but has a limited budget. Which solution supports the customer's requirements?
6.
A customer wants a tool that will help convert some legacy RPG green screens to a more graphical, user-friendly interface. Which IBM solution provides this capability?
7.
An IBM i customer has a 4-core POWER6 520 with unlimited user entitlements. The customer would like to purchase a new 6-core Power 740. The customer is up to date on SWMA. What are the customers software transfer options?
8.
What is the definition of single-level storage in IBM i?
9.
A Power 720 customer with IBM i 6.1 and 8 disk units has limited time to load and apply PTFs. Which capability will minimize the preparation and installation time?
10.
What happens each time disk capacity is added to the storage pool?