A customer wants to make certain all connections to their RSA II management cards installed in their
x346 servers are secure. Which of the followings options could be used to ensure this requirement?
A customer is in the initial stages of implementing a server consolidation project. The Information
Technology staff has identified several Microsoft Windows servers that are running single applications on
older hardware and averaging under 20% utilization. Part of their server consolidation goal is to lower the
number of servers, decrease the operating system license cost, and increase utilization per server. Which
of the following IBM Director extensions could be used to satisfy all of these requirements?
An Information Technology (IT) staff has many calls from users who are unable to print or who lose print
jobs. After investigation, the IT staff has determined that the print spooler is stopping sporadically. Which
of the following actions in IBM Director would best resolve the issue?
A customer has a Linux server farm and wants to use IBM Director to manage all of their systems.
Which of the following is the preferred installation of IBM Director to fully manage the Linux systems?
A customer is creating an Event Action Plan to monitor CPU utilization on their SQL server. While
creating a Simple Event Filter, the event type "Director.Director Agent.CPU Monitors" option is not available.
Which of the following is the most likely source of the problem?
A customer wants to deploy the latest ServeRAID driver and firmware updates to 25 servers on their
LAN. This needs to be accomplished during off peak hours when LAN utilization is at its lowest. Which
IBM Director component would be used to accomplish this?
A customer runs an application on a supported 8-way x445. The customer needs to monitor
operations and wants to be alerted when problems arise. Which TWO of the following can be configured
in IBM Director Base Pack to monitor the customer's operations?
A customer has a large HP Intel infrastructure and is actively managing these servers with Insight
Manager. They recently purchased an IBM x346 server for a remote office database project. They do
not want to run additional systems management software but require to be notified of PFA and hardware
alerting on critical hardware components. Which of the following solutions would accomplish this?
A customer is running a number of HP Intel servers within an IBM management environment. The HP
Insight Manager agent is already installed, but they do not want to install the Director agent because of
potential conflicts. Into which system are the MIB files compiled?
A company needs to connect seven of their Windows-based servers to a DS4000 storage server.
The DS4000 only has two host-side connections, and each server has two HBAs. Which of the following
is the lowest cost solution to provide no single points of failure?