1.
You have just created an eDirectory tree and installed 3 servers into the tree. The tree has one partition. Server1, Server2, and Server3 were installed into the Corp container. Server2 crashed and you removed it from the tree before you installed additional servers. The additional servers installed in the tree were Server4,  Server5, Server6, and Server7. Server4 and Server5 were installed into the Prod container. Server6 and Server7 were installed into the Acct container. The Corp. Prod, and Acct containers are children of the tree root. The servers were placed in the tree in the following order Server4, Server5, Server6, Server7. You haven't had the chance to manually add replicas to any server. Which servers hold replicas?
2.
What is a good recommendation to follow when designing partitions for lower layers in the tree?
3.
In which eDirectory objects do WAN traffic policies reside? (Choose 2.)
4.
You are the project lead of your company's eDirectory design and implementation effort. Your company is installing 10 NetWare 5 servers. You are getting ready to design the eDirectory tree. In accordance with the eDirectory design cycle, which tasks should you complete before you design the eDirectory tree? (Choose 2.)
5.
What is the first step when creating a user environment plan?
6.
Which object contains a list of global defaults for DHCP options, DNS and DHCP servers, subnets, and zones in the tree?
7.
Which considerations should you make before implementing a time provider group synchronization strategy with SAP turned off to minimize network traffic? (Choose 2.)
8.
You have set up SLP and have loaded all the agents. A user on the network loads an application that makes a request through the clients user agent. The user agent then sends a request directly to which agent?
9.
You are the network administrator for your company and are designing the upper layers of your eDirectory tree. There are 2500 users and 30 servers located at 5 sites connected by a WAN. Which design is ideal for this type of network?
10.
Determining the scope of the design process and creating a preliminary schedule occur during which phase of the eDirectory design cycle?