1.
When planning for fault tolerant power connections, how should each device to be connected?
2.
A company has FC patch panels in their data center. They plan on using them to interconnect their storage controllers to the FC switches and the hosts using the storage. They have 62.5 micron cable between the patch panels. Which cable should you use on the NetApp storage controller's Target Ports to make this a supported configuration?
3.
NetApp supports multiple FC paths from the host to the NetApp storage controllers. In addition to using multiple FC switches, which other NetApp supported components should you use for this type of configuration?
4.
A company has an assortment of operating systems in their environment. Which operating system is NOT currently supported by NetApp for their FC solutions?
5.
Which components must you configure when configuring CHAP to be used with iSCSI?
6.
What should you do to verify FC connectivity between the host and the FC switch?
7.
What is the appropriate method for testing high availability controller failover?
8.
What should you do to test NetApp storage controller failover in a high availability FC environment?
9.
Which command do you use on a Brocade switch to view all defined zone configuration information?
10.
Which command do you use on a Cisco switch to view the currently active zoneset?