1.
Where does the subaccount for a labor cost transaction defaults from?
2.
In the Week Maintenance screen the Salary Factor is used for calculation on which employee pay type criteria?
3.
Assuming, option to Cost Labor on Entry radio button is selected, and when using the Timecard or Timesheet with Rate/Amount Entry screens, rates and labor cost amounts are displayed when the following entry type is used?
4.
Which of the following system-defined code types used in Timecards for Projects is required under all circumstances?
5.
If the Premium Portion of Overtime is separated, what posting occurs with 1 hour of overtime?
6.
Week Maintenance is set up so that the week ending May 31 posts to Labor and Fiscal Period 05-2002. Period 05-2002 is closed in the Project Controller module, and the current period represents fiscal period 07-2002. There is still a timecard in process for the week ending May 31, 2002. If the timecard is posted now, what will occur?
7.
A salaried non-exempt employee works 50 hours in a week, 40 hours are regular hours and 10 hours are overtime. This employee's salary is $1,000 per week and $25 per hour. Assuming the employee worked on the same project all week, what is the cost to the project?
8.
Within a Rate Table, how many keys can be used for a rate lookup?
9.
In which fields can wildcards be used in an Allocation Method?
10.
Select all that applies for the purpose of the Transaction Date in Allocation Processor?