1.
You need to perform the directory synchronization with Office 365. What should you do first?
2.
You need to design a solution for the recovery-time objective. Which two actions should you perform? Each correct answer presents part of the solution.
3.
You need to configure the connection between the new remote branch office and the existing branch offices. What should you create?
4.
You need to plan the expansion of the Los Angeles office. What should you do?
5.
You need to plan the migration of App1. What should you do?
6.
This question consists of two statements: One is named Assertion and the other is named Reason. Both of these statements may be true; both may be false; or one may be true, while the other may be false. To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must host the DNS zone research.contoso.com on MADSRV1.
Reason:
You must host Domain Name System Security Extensions (DNSSEQ zones on Active Directory Domain Services-integrated DNS servers. Evaluate the Assertion and Reason statements and choose the correct answer option.
7.
You need To configure the Group Policy for salespeople. Solution: You create a Group Policy Object (GPO) with an AppLocker policy. You link the GPO to the Computers OU for each location. Does this meet the goal?
8.
You need To configure the Group Policy for salespeople. Solution: You move all shared desktops to a separate organizational unit (OU). You create one Group Policy object (GPO) that has an AppLocker policy rule and enable loopback policy processing within the GPO. You link the GPO to the new OU. Does this meet the goal?
9.
You have an IP Address Management (IPAM) server that runs Windows Server 2012 SP1. You need to integrate the IPAM server with System Center Virtual Machine Manager (SCVMM). Solution: You create a dedicated user account named IPAM_svc, and add it to the Local Administrators local group on the SO/MM server. Does this meet the goal?
10.
A company has offices in multiple geographic locations. The sites have high-latency, low- bandwidth connections. You need to implement a multisite Windows Deployment Services (WDS) topology for deploying standard client device images to all sites. Solution: At each site, you deploy a local WDS server that runs only the Transport role. You configure local DHCP servers to direct local clients to the local WDS server. Does this meet the goal?