1.
What two methods are used to change the status of production orders? Choose the 2 that apply.
2.
You are the consultant on a Microsoft Dynamics NAV 2009 implementation. Your client is setting up Item Cards. In the Flushing Method field, the available options are Manual, Forward, and Backward. Your client asks you to explain how material is consumed when forward flushing is selected and routing link codes are not used. What explanation do you provide to your client?
3.
In Microsoft Dynamics NAV 2009, you set up different levels of work facilities. What are the different work facility levels available?
4.
You are a consultant implementing Microsoft Dynamics NAV 2009. You are assisting your client in setting up a Work Center. On the Scheduling FastTab your client has selected minutes in the Unit of Measure Code field. Your client tells you that for the Assembly Department, there are five employees working an eight hour shift. Your client also tells you that time study results indicate that the employees work on average 6.4 hours of the eight hour shift. What entries do you advise your client to make in the Capacity and Efficiency fields on the Scheduling FastTab?
5.
You are a technical support specialist for Microsoft Dynamics NAV 2009. You receive a call from a client requesting assistance with production BOMs. Your client has an existing BOM for a finished good. For a set period of time, your client wants to include an additional component when producing the finished good. What advice do you give your client to handle the additional component for the finished good?
6.
You are a consultant implementing Microsoft Dynamics NAV 2009. You guided your client through the steps to populate a Planning Worksheet using the MPS selection for the Calculate Net Change Plan function. One of the lines populated in the worksheet has the MPS Order check box selected. Your client needs to generate the dependent requirements for the line. What function do you have your client perform next so that planning is complete for the line?
7.
The overall purpose of MRP is to provide timephased formal plans, by item, to supply the right item at the right time, in the right place, and in the right quantity. MRP uses action messages to tell the user what must be done to meet demand. What action messages are displayed in the planning worksheet? Choose the 3 that apply.
8.
You are a technical support specialist for Microsoft Dynamics NAV 2009. The production planner for one of your clients contacts you regarding a planning problem with a particular finished good. The planner explains that for a recently modified production BOM, the planning results are incorrect. You determine that the production BOM for the finished good was recently modified to include an additional level; afterwards, the status was updated to certified. You also confirm with the client that the Dynamic Low Level Code check box is not selected in Manufacturing Setup. Based on your conversation, what is the first step you have the planner perform to properly plan the finished good?
9.
What is the purpose of the Matrix per Version window?
10.
What status codes are available for production orders?