When inventory transactions for completed quantities are processed as financially updated during the
backflush costing calculation, which status is the receipt status updated to reflect?
Components have been consumed by a production flow.
When the backflush costing process is run at the end of a period, in what order are the consumed
components processed?
A manufacturing Kanban is reported as complete for a product whose receipt type is inventory controlled.
To which ledger accounts does the transaction post?
An inventory controlled withdrawal Kanban is posted between two sites in the same legal entity.
Which cost is used to post transactions in the receiving organization?