You are the production supervisor at a chemical processing plant. You must track attributes for each batch of chemicals. Automated quality orders must be
generated when a batch order for these chemicals is reported as finished.
You need to ensure that the values of attributes are updated and tracked.
What three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
A manufacturer produces HDMI cables. Typically, the item is manufactured.
The manufacturer will occasionally buy unbranded HDMI cables from a vendor in order to keep up with demand. The company must use the same item number
whether they make or buy the item.
What should you do?
885CB989129A5F974833949052CFB2F2
A company produces paints and assembles bicycle frames.
You must account for paint drying time before assembly operations can begin. You need to set up the operation to encompass queue times.
Which two options can you use? Each correct answer presents part of solution.
NOTE: Each correct selection is worth one point.
You maintain responsible resource calendars and production orders for a manufacturing company. All production resources use the same production calendar.
A machine in the facility is defective and must be closed for repairs for the next two days.
885CB989129A5F974833949052CFB2F2
You need to configure the resource calendar to close the resource for production for the next two days.
What should you do?
A manufacturing company is implementing Dynamics 365 for Finance and Operations. The company uses a standard costing model to value inventory.
During the setup of the system, all areas that impact the standard cost of the item must be configured correctly to calculate a complete standard cost by using
routing, Bill of materials (BOM) and overhead burden.
You need to verify that all areas of the system are correctly configured.
Which object does NOT impact the standard cost of manufactured items?
A company is looking to use Dynamics 365 for Finance and Operations.
885CB989129A5F974833949052CFB2F2
The company is in the process of redesigning and retooling an existing manufacturing plant to group similar, cellular operations to improve efficiency and minimize
wasted time between operations. They want to locate raw materials close to where they are needed without losing reorder visibility.
You need to set up their environment.
Which kind of production type should you implement?
A company is looking to use Dynamics 365 for Finance and Operations.
The company is in the process of redesigning and retooling an existing manufacturing plant to support a large long-running contract. They want to be able to
forecast capacity to easily ramp up for additional products.
You need to set up the environment.
Which type of manufacturing should you implement?
A company produces generic and name-brand paper plates in the same factory using standard costing and using the same Bill of materials and routes to produce
both products.
The finance and production teams want a way to view individual raw material consumption costs in the ledger.
You need to add a production group to control postings to the ledger.
What should you do?
A manufacturing company uses advanced warehouse management functionality for a new warehouse.
After releasing a production order, you observe that the warehouse work for raw material picking was not generated.
You need to go through the warehouse management setup to determine what is missing.
What three setup configurations must you validate? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
A company produces multiple products that require an installation kit that includes 50 components.
The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not
want it to produce a separate production order.
You need to set up the product BOM for the finished good.
What should you do?