1.
You need to create a new version of a bill of materials (BOM). Which three options can be used to create a new version of the BOM? Each correct answer presents part of the solution.
2.
You need to identify what information is available in the Composed of - tree form from a sales order line. What should you identify?
3.
You create a new product and a new bill of materials (BOM) for the product. The product is available in three different configurations. Which statement about these configurations is true?
4.
You create a new product that has a bill of materials (BOM). You add several lines to the BOM. Some of the lines are items. Some of the lines represent a sub-assembly. You set the line type for one of the sub-assembly lines to Vendor. In this situation, what does the Vendor line type indicate?
5.
You have a bill of materials (BOM) item. All lines of the BOM item use a constant scrap amount and a variable consumption. You identify that when you have a production run of 100 items, the scrap cost is 10 US dollars and the unit cost is one US dollar. You need to identify what will be the cost in the BOM calculation when you increase the size of production to 200 units. Which cost should you identify?
6.
You need to ensure that when users perform bill of materials (BOM) calculations, they receive a warning message if any manufactured components are missing an active BOM. What should you configure?
7.
You have a bill of materials (BOM) item that has several components. You specify the measurements of a BOM component. You need to identify when the measurements of a BOM component are calculated. What are two possible events that will cause the measurements to be calculated? Each correct answer presents a complete solution.
8.
You need to report a bill of materials (BOM) as finished. Which three settings should you specify before you report the BOM as finished? Each correct answer presents part of the solution.
9.
You have an item that is a component of several bills of materials (BOMs). You need to change the item number of the item in all the BOMs that use the item. Which process should you use?
10.
You create a new product change case for an item. You need to add associations to the product change case. Which types of associations can you add to the product change case?