1.
Which of the following is a routing status type?
2.
If quick manufacturing orders are being used, what option(s) must be marked in the Routing sequence entry screen?
3.
What type of routings can be creating within the Manufacturing Routing Module?
4.
Which of the following routing times are calculated on a per piece basis?
5.
To make changes to a manufacturing (active) routing without changing the planning routing first, what window is used?
6.
Assume the cost of one component is $10. In component transaction entry, a quantity of 5 for this component was issued for one MO. At MO receipt, an additional 2 were consumed, for at total consumed of 7. Also, a quantity of 3 was backflushed. What will be the Material variance for this component at MO Close?
7.
What must be entered in the system before you can create a manufacturing order?
8.
The Purchasing and Shipping buttons will be enabled on MO Entry if which of the follow statements are correct?
9.
Manufacturing Orders can be created by, or within, all of the following processes except?
10.
Which statement is true regarding saving allocation pick doc in the Component Transaction Entry window?