1.
Before using outsourcing, what setup is required?
2.
Which of the following costs on the outsourced purchase order can be applied to the Manufacturing order, assuming the option to Apply Additional Outsourcing Costs to MO is chosen?
3.
To add a sales item (an item that has been on a sales order) to a forecast through the sales history item addition, which of the following requirements must be met?
4.
Assuming the option to Consolidate Similar Item is chosen, line items will be combined on a sales forecast if they have which of the following similar traits?
5.
In the Adjust Forecast Quantity window, which of the following are possible?
6.
Which of the following conditions must be met to generate a manufacturing order from the Master Production Scheduling (MPS) window?
7.
Which of these methods activates a sales forecast (transferred to a master production schedule)?
8.
Which of the following tasks can be performed from within the Master Production Scheduling (MPS) window?
9.
Which of the following Inquiry Windows will display MRP generated information?
10.
Which statement(s) below are correct regarding MRP?