1.
What is the purpose of the BOM Security window?
2.
In manufacturing job costing, how is an "element" defined?
3.
What is the term used for routings that are created within routings, and that outline a series of steps that are common to all items?
4.
When setting up a new actual cost finished good item, which of the following accounts should be set up if both material and labor data will be collected for the item?
5.
What manufacturing order status is required in order for the configured bill of material to be modified from Sales Configurator?
6.
Which item(s) below is a Job Costing "element"?
7.
Which of the following can best be used to analyze the items based on the items usage, on hand quantity, or item cost?
8.
What is the standard material cost for Item A given the item has the bill of material (BOM) structure set up with the components, Qty Per, and standard costs as Item X, 5, $5.00 and Item Y, 1, $2.50?
9.
In manufacturing job costing, how is an "element" defined?
10.
The option to maintain shipping history can be selected in which window?