1.
Which principle or technique is considered as the base platform for TPM?
2.
What is not part of set up reduction ?
3.
Which technique models the manufacturing system as a chain?
4.
What is is a method for maintaining an orderly flow of material.
5.
What does the one-piece-flow refers to ?
6.
What refers to lean manufacturing ?
7.
Which generic approach's precursor is the Toyota Production System ?
8.
What will be takt time for single 8 hour working shift including 1 hour lunch break for customer demand of 480 units per day?
9.
What is included in JIT ?
10.
Which setup type need to be converted under SMED implementation, as per the eight techniques ?