1.
Which of the following does not represent an improvement wave for the industry ?
2.
What is the responsibility of operators when included in a cell ?
3.
Which waste is also called over-processing?
4.
What results after heijunka levelled scheduling ?
5.
Which waste elimination technique focus on organizing the workplace?
6.
What does the lean manufacturing aims to ?
7.
Which sigma level does companies are assumed to operate without any six sigma implementation?
8.
Which is not listed as one of the eight wastes ?
9.
What does takt time measures?
10.
What does Gemba walk results in ?