1.
What does JIT refers to ?
2.
What will be the maximum output per hour from a process with four steps having outputs of 20 units/hr, 25 units/hr, 30 units/hr and 15 units/hr?
3.
What factor limits team's effectiveness?
4.
What is the quality factor for a machine with ideal operating time being 50 minutes and lost operating time being 5 minutes?
5.
Which of the following is an Muda
6.
Why visual displays should be located as close as possible to the team
7.
What should be the basis for organizing change over ?
8.
What does boxes in a production chart refers to ?
9.
Which TQM technique is used under lean manufacturing?
10.
Which of the following is the first phase in 5S?