A customer plans to install additional x240 nodes in their PureFlex. The customer plans to implement each of the following aspects. Which of the following requirements cannot be satisfied by the x240 and must be addressed separately?
A System x sales professional is discussing IBM Systems Director with a customer. The customer has both IBM and HP servers installed. The IT Director favors the HP Systems Insight Manager products. Which of the following points should be stressed in this situation?
A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS23 blades running Red Hat Linux in IBM BladeCenter H chassis. The customer has already chosen Intel low power CPUs. The customer requires 45 GB of storage. Which of the following on-board storage options allows the customer to reduce power consumption of each blade?
A customer is planning to implement a new x3850 X5 server and wants to connect to their existing EMC CLARiiON CX700. Which of the following resources should the specialist use to verify that this is a supported solution?
A customer has a need to automatically move critical workloads in the event of a predictive failure alert. Which of the following addresses this requirement?
A prospect is considering a BladeCenter H chassis with 10Gb switches. The number of Ethernet ports is important to them. What is the best source for information?
In meeting with a customer, the customer states that the proposal that was submitted will greatly benefit the customer. The customer is anxious to move forward. The customer also states that they are the decision maker. However, the customer states that the cost for the project is greater than the budget. Which of the following is the next step to provide mutual benefit?