A customer orders two lines, Item1 for $10 and Item2 for $90. The customer soon decides he wanted the updated model instead, and Return1 and Exchange1 were created for Item2 with a value of $110 as a regular exchange. Item1 was a gift and the recipient of the gift returned it for an alternate item of $7 value. Return2 and Exchange2 were created for Item1 with a value of $7 as an advanced pre-paid exchange. The items are received at the warehouse at the same time. Assuming the payment processing APIs are run, which of the following choices provides the correct details for:
Payment type charge sequence is configured as follows: All tenders require authorization and charge. An order totaling $120 is created with three payment methods with the following maximum charge limits and sequences passed: What is the sequence in which authorization requests are created, and in what amounts?
In a current implementation of Sterling Selling and Fulfillment Suite, a custom entity is created with search, list and detail views. The detail view has four inner panels and there is no anchor page specified for the layout of these panels. What will be the effect of this when a user navigates to the detail view?
In a current Sterling Selling and Fulfillment Suite implementation, the item feed is received from an external system and the item messages are placed in a JMS Queue. An Integration Server and ItemLoad Service is created to consume the messages and load into the OMS Database. The customer wants to specify static values for a few attributes for all the items. The customer also wants the ability to change the values on an as needed basis. As a solutions designer, which of the following is BEST suited to meet this requirement?
In a current implementation of Sterling Selling and Fulfillment Suite, there is a business requirement to add
additional columns to the YFS_ORDER_HEADER table, and these changes are made in the database
extension XML file. This change has caused the getOrderDetails API output template to be extended. Which
two JAR files must be rebuilt for these changes to take effect?
In a current implementation of Sterling Order Management, there is a business requirement to: 1.print item
labels with barcodes for item IDs 2.generate and print Operational Reports for the Order Processing. Which two
of the following are supported by Sterling Order Management to meet this requirement?
Today is October 2 (2-Oct in the image).
The current supply and demand for open order demand type is shown in the following image:
Assume out of box inventory rules (ATP rules and inventory considerations). Based on calling getATP or find
Inventory, what is the Availability picture for 2-Oct when looking for open order demand type?
An organization is configured as an enterprise and a seller, but it does not maintain inventory. The inventory is maintained externally. When a customer places an order for five units of item X, the system needs to determine whether five units of the item are available to fulfill the demand. How can a solution designer enable Sterling Order Management to fetch the availability picture maintained by the external system?