1.
A Power customer running AIX asks how they will migrate their AIX environment to PureFlex. Which of the following accomplishes this task?
2.
What risk should be identified during a Pre-Sale TDA for the recovery of the FSM?
3.
A customer is considering moving his data to a PureFlex System. Which of the following tools provides ROI?
4.
A customer plans to have an IBM PureFlex System Standard with x240 and p260 nodes installed at a hosting facility where power usage is charged by consumption. 75% utilization is expected. Which of the following can be used to provide power consumption for the chassis for budgeting purposes?
5.
A customer is considering a PureFlex Standard solution. Which of the following is included in the five day IBM Lab Services engagement?
6.
A Power System customer is considering a PureFlex. The PureFlex technical specialist wants a simple way to document their system from the HMC. Which of the following GUI options will produce this information?
7.
A PureFlex customer running many AIX 6.1 TL06 instances needs to maintain current system performance while reducing the data center footprint. Which data gathering tool would help determine the minimum amount of Power Compute Nodes required?
8.
How are the management networks of two PureFlex chassis interconnected?
9.
A PureFlex technical specialist is planning a deployment of IBM PureFlex Power Compute Nodes. Which of the following must be considered when selecting DIMM profiles for each Compute Node?
10.
Which is an advantage of the 10Gb Scalable Switch module over the 10Gb Ethernet Pass-thru module?