A client needs to analyze data in motion in order to be able to respond to millions of events as they happen per second.
Which offering will satisfy their requirement?
A customer is setting up two new partitions where IBM i is hosting the storage. The customer's high priority is to complete the backups to physical tape as fast as
possible, while automating the movement of the single tape library between the partitions Tape library functions are needed for the backup.
Which combination of storage virtualization will achieve the customer's backup priority''
A customer with IBM i and AIX platforms wants to take advantage of a recently acquired XIV Storage System, TS3500 and POWERS system. They are planning to
implement 10 LPARs and need to have access to the tape library for SAN backups. The customer also wants to minimize the downtime by VIO Server
maintenance.
Which option will satisfy their requirements?
An AIX customer wants to be sure they can update their SAN multipath drivers with a minimal amount of risk, while still being able to perform Live Partition Mobility
operations.
Which disk connectivity technology supports these requirements?
A customer running AIX wants to run DB2 on a new S824 server with uncapped partitions. The customer has licensed DB2 for 15 of the 24 active cores and will use it in multiple partitions. How can the customer ensure that DB2 does not exceed the number of licenses purchased?
A customer wants to consolidate AIX, Linux and IBM i workloads. They are also thinking about Analytic applications and a small-to-mid-size database. Which of the following servers satisfies the customer's requirements?
A customer wants to move from an IBM Power 740 to an IBM Power S824. The 740 contains:
(4) disks in the CEC
(10) disks in a FC #5802 (I/O drawer with disks)
(12)disks in a EXP12S
(24) disks in a EXP24S How many disks can be reused with the S824'?
How many disks can be reused with the S824?
A customer wants to install a POWER8 tower system at a remote site. The system will run Red Hat Linux. Which system is the best option for the requirement?
A customer would like to consolidate their five AIX servers to one S822 server, in a virtual environment with two VIO Servers for boot drives. What is the minimum requirement?