1.
A customer needs to update their Linux application and is comparing Power to x86 solutions. What benefit can be highlighted to demonstrate the value that POWER8 offers compared to x86 solutions?
2.
A customer wants to make use of a public cloud solution for applications that run on Linux on Power. Which of the following can accommodate the customer requirement?
3.
A customer acquired a local rival year that had two existing POWER6 570s: each with 16-cores running in an active/active cluster with IBM i and PowerHA. They are ready to refresh the solution using an active/passive cluster with a minimum of 26 cores for their production partition. The customer has a limited budget. For the least cost, which option should the Power Seller propose?
4.
A customer has many x86 systems running Linux and has run out of server rack space. Which statement indicates how Power Systems provides a solution to resolve the space issue?
5.
Which analytics solution is supposed on Cognos?
6.
A customer wants to run multiple workloads and is considering an S824 and an E850. Under which condition will the E850 be more appropriate?
7.
POWER8 systems introduced a feature to keep it running under power and thermal limits. This improves performance and energy management, while providing additional system reliability and availability.
8.
A client is considering acquiring an E850. What is the minimum number of physical cores that can be proposed?
9.
A customer is purchasing a new POWER8 Scale-out server and desires three years of hardware maintenance with 24 hour by 7 day coverage. Which option satisfies this request?
10.
A customer wants to acquire a server that can run Linux. The customer is interested in the active memory mirroring feature for the hypervisor. Which of the following offers the best price/performance option for the customer?