1.
A customer is considering a Power Systems solution to provide in-memory table look-up for large volumes of unstructured data for their mobile and social applications. Which of the following Power Systems solution editions satisfies the requirement?
2.
Which interface supports connectivity between the POWER8 processor and the accelerator on the S824L?
3.
A client would like to automate provisioning of new virtual machines with an end user self-service interface. Which of the following will provide that functionality?
4.
In addition to higher bandwidth and lower latency of eDRAM on POWER8 over SRAM on x86, what is another compelling benefit of POWER8 technology?
5.
A customer is purchasing a new POWER8 Server and will make a choice between PowerVM and PowerKVM. What is an advantage of PowerVM over PowerKVM?
6.
Which of the following is true for an IBM Power Enterprise processor pool?
7.
What primary advantage does Integrated Facility for Linux (IFL) provide for the customer?
8.
Which feature of the POWER8 processor can be used to improve performance in a Websphere Application Server environment compared to an x86 processor?
9.
A retail customer has implemented the following at each store location:
10.
What is the minimum amount of rack space that an 80 core E870, without any I/O drawers, will take up in a 19 inch rack?