A customer has purchased a POWER8 server and will deploy dual VIO servers to provide virtualized access to storage and networking. The customer has skills in both managing Power Systems and Storage. The system contains two 4Gb FC adapter. A V7000 will be used for storage. Which virtualization technology would be used to present storage to the client partitions?
A P0WER6 customer is considering an upgrade to a new Power System, and needs to ensure availability at a DR site. The recovery point must be as close to current as possible without going to continuous availability. Recovery time must be less than four hours. What should be proposed to the customer?