A customer plans to deploy a 24x7 application, and is evaluating prospective solutions based on which would offer the highest level of application availability. Which of the following solutions should be presented to the customer for consideration?
A customer is interested in virtualizing their environment. PowerVM and VMware are the products whose hypervisors are best suited for their existing infrastructure. Which advantage of PowerVM over VMware will most benefit their environment?
A customer is considering running Linux in a virtualized environment and is evaluating the differences between PowerVM and VMware. Which of the following would be an advantage of PowerVM?
A customer plans to implement 3 production partitions on a Power 720, one each of AIX, IBM i, and Linux. The customer does not want to purchase an HMC, and will use IVM. Which of the following is minimum PowerVM Edition required to manage the partitions?
A customer is managing a Power 720 with dual VIO Servers with a 7310-CR4 HMC. A PS701 blade which requires Active Memory Expansion (AME) will be added to the environment. Existing resources must be reused as much as possible. Which of the following supports the configuration?
A customer is running AIX and IBM i partitions on a POWER7+740 attached to a Storwize V7000 and needs both High Availability and Disaster Recovery. Which of the following pars of actions supports these requirements?
Active Memory Sharing (AMS) for an HMC managed system with multiple partitions is being planned. In addition to updating system firmware, HMC, and modifying partition definitions, which of the following must be considered?
A customer is interested in upgrading their POWER6 570 with 32 cores.
The customer has the following requirements for the upgraded system:
- CEO Hot Add and Repair Maintenance (CHARM)
- 50% increased core count
- 2TB of memory
At a minimum, which system supports the customer needs?