1.
A customer is purchasing a 6-core Power 720 with 1 1TB of storage to implement a new product line. The customer has one rack with 5U available for the solution, and does not own a SAN. Which solution supports the storage requirements for this customer?
2.
A client is configuring an LPAR that will participate in a shared processor pool:
- The shared processor pool contains 8 cores
- The LPAR entitled processing capacity is 3 processing units
- The workload is highly threaded, and uses SMT4
What is the maximum number of virtual processors that will ensure optimal performance?
3.
AIX licensing for a Power Systems server is based on which of the following factors?
4.
Which AIX Security option provides three layers of access control: Discretionary Access Control (DAC), Mandatory Access Control (MAC) and Mandatory Integrity Control (MIC)?
5.
A client has recently purchased an IBM Flex System with several p460 nodes and p260 nodes. What IBM tool is required to manage the Power System nodes?
6.
A client is considering implementing PowersC into their current AIX 7.1 environment, Providing a secure virtualization layer through a Trusted Firewall is the main priority. Which Edition of PowerSO supports the requirement?
7.
What are the primary factors to be considered when evaluating the bandwidth requirements of an application?

 
8.
A customer has a mix of POWER5, POWER6, and POWER7 systems and wants to measure and control the power utilization. What is needed to support this requirement?
9.
A customer is interested in High Performance Computing, and considering a Power 775 server. Which of the following is a primary consideration in the decision making process?
10.
A customer needs to keep AIX 5.2 running in their environment, but they want to run on POWER7 hardware. What is the best method to accomplish this task?