1.
How does IBM Maximo Asset Management address the Sarbanes-Oxley question:
2.
Redeploying or reusing an asset is reflected in which IBM approach to asset management?
3.
Which type of contract represents an agreement to spend a predetermined amount with a vendor over a period of time?
4.
A customer wants to create a repeatable and structured work order approval process. They require the maintenance supervisor to review and approve any work order for assets in their PRODUCTIONLINE location. What is a solution for this requirement?
5.
Which application is used to customize rather than configure?
6.
Which add-on solution provides integrated map information when processing a work order?
7.
Where are the work details for completed PM work captured?
8.
A client has a site with two buildings and each building is a top level location. Each location has a child location such as floor, room, kitchen, and so forth. Although both of these locations are similar in location hierarchy design, one of the buildings is consistently costing more to maintain per month. How would a Solution Advisor address this issue in a short time without incurring additional costs for the client?
9.
It is discovered that although a client has a storeroom, they do not maintain the stock levels or condition of the parts because this is done by a third party. Which type of inventory will need to be set up in IBM Maximo Asset Management?
10.
In which scenario can an invoice be approved without a purchase order or contract reference?