1.
A new Power 720 needs to be configured with 3 LPAR5. Each LPAR must have its own physical disk, physicalLAN, physical tape attachment and access to a shared DVD drive. Which tool allows a partner to model the system to ensure these requirements are supported?
2.
What feature of PowerVM Enterprise Edition first became available to IBM i customers at 7.1?
3.
A customer has a specific application that needs the highest levels of availability and site disaster recovery, while other applications are not as critical. Which statement supports this requirement?
4.
Which customer requirement is supported by WebSphere Application Server- Express?
5.
Why do many customers have a minimal number of technical staff devoted to database management and administration for their IBM i environments?
6.
A prospective customer is comparing an IBM i solution to an Intel-based solution. They have expressed a concern about recent virus attacks upon others in their industry. Which of the following is a correct statement about IBM i that may make the customer feel better about an IBM i solution?
7.
A client needs to dynamically move partitions from one server to another to reduce downtime for scheduled system maintenance. In addition to POWER7/7+ systems, which of the following combinations of products are required?
8.
What upgrade options does a PQWER6 570 with some inactive cores have?
9.
A customer has IBM i, AIX and Linux on Power Systems and Linux on x86. The customer is refreshing their infrastructure and might drop IBM i as they cannot maintain management skills for all their different virtualization software. How can this issue be addressed?
10.
Which statement about DB2 for IBM i would be attractive to a 010 responsible for data protection?