1.
An IT Director needs a relational database but cannot hire a Database Administrator (DBA) to maintain it. How does IBM i address this challenge?
2.
A 010 is concerned about systems security and transmission of confidential data across the internet. What capabilities of the IBM i platform can the sales executive highlight in this situation?
3.
A prospective customer is considering a Power Systems solution with IBM i and PowerVM. Other possible solutions being proposed to this customer are: x86 with Linux, Oracle, and VMware x86 with Windows, SQL Server, and VMware How does the acquisition cost and TOO of the Power Systems solution compare with the x86 solutions?
4.
A Power 770 customer wants to purchase second Power 770 that would only be used in a disaster recovery (DR) situation. They have stated that the cost of purchasing the same number of IBM i licenses for an inactive DR system is too expensive. Which solution supports the DR requirement and addresses the concern about IBM licensing costs?
5.
An IBM i customer needs 3 additional test environments to run IBM i, AIX and Linux. They currently have only one IBM i environment. Which of the following is the minimum needed to add the 3 new environments?
6.
A customer with a POWER7+ 770 running IBM i has just merged with another company which utilizes older Intel technology to support an application environment that consists of PHP applications, Red Hat Linux and SAP. The POWER7+ 770 has 8 cores available with just 4 months before the busy season begins. The customer needs to integrate the new acquisition before the busy season begins, and at lowest cost. Data center floor space is limited. Which of the following best supports the customer requirements?
7.
Under which conditions would adding SSD5 be an appropriate technical and financial solution for a customer?
8.
Which of the following represents a unique characteristic of IBM i and DB2 that is designed to reduce the amount of time it takes to restart a system and database after an abnormal end, such as a power interruption?
9.
An 010 plans to purchase a new Power System. In a previous purchase of non IBM servers, critical components were missing from the proposal. As a result, additional items had to be purchased. Which IBM tool will help ensure that the proposed system contains the necessary components?
10.
An IBM i customer has a requirement for a new LPAR. The customer needs 1OTB of usable disk, but has minimal requirement for performance. The customer will have to purchase new storage and adapters for their existing Power 740. What is the most cost effective option?