1.
Which statement(s) describe an undesirable situation when implementing SPC?
2.
If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?
3.
After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?
4.
A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?
5.
Multiple Linear Regressions (MLR) is best used when which of these are applicable? (Note: There are 3 correct answers).