An engineer has connected a monitor, keyboard, and mouse to a VRTX chassis. The engineer is unable to see or control the first blade. What must the engineer do to control the first blade with a connected monitor, keyboard, and mouse?
An engineer needs to perform hardware configuration, including RAID, on a new batch of 30 identical server nodes. OpenManage Essentials is installed, and the sever nodes have been discovered via iDRAC. The engineer needs the most efficient way to replicate the configuration from a single configured system without losing connectivity to the iDRAC. How should the engineer perform this task?
An engineer configures an Alert Action in the CMC to send an email on Warning and Critical events. Chassis fan and power events are showing up as expected. Server-specific failures such as memory module failures only indicate that the server has gone into a Critical or Warning state. What additional configuration needs to be done to be informed via email of the detailed server failure?
An engineer is updating the IOM Infrastructure Device firmware from the CMC GUI. The IOMINF device is NOT listed as a device that can be updated. What is causing this issue?
An engineer is performing system updates on a large number of systems using OpenManage Essentials. The engineer has been instructed NOT to update network adapter firmware at this time. How can the engineer exclude a firmware update while still using the Dell Online Catalog source?
A VRTX server is being set up for a new customer and configured with four blades. After a shutdown from a power outage, blades do NOT power up automatically upon power restore. Blades can be powered up either manually or via CMC. Which setting should be verified to make sure blades automatically power up upon power restore?
An engineer is installing a known good PCIe storage adapter in SLOT 1 of an FX2 chassis with four half height nodes. Node 1 is NOT detecting the adapter. What must the engineer do so that node 1 can detect the adapter?
An engineer is adding an additional server to a chassis with 15 existing servers. The new server will NOT power on in any slot, even known good. Existing server configuration
- Dual processor
- 256GB Memory
- PERC RAID Controller
- 2x 1TB 7200RPM SATA HDD
- QLogic Dual Port 10GbE Network Daughter Card (Fabric A)
- QLogic 16Gb Fibre Channel Mezz Card (Fabric B)
New server configuration
- Dual processor
- 192GB Memory
- No RAID
- Internal SD Card
- Intel Quad Port 1GbE Network Daughter Card (Fabric A)
- QLogic Dual Port 10GbE CNA Mezz Card (Fabric B)
The details of the chassis are as follows:
- Four 2700W Power Supplies
- Redundancy Policy is configured for Power Supply Redundancy
- Plugged into 220V AC
Power Monitoring logs show the original server's max draw as 418W each.
Which problem needs to be addressed to fix this issue?
An engineer is troubleshooting a VRTX with the following configuration:
- Dual Shared PERC Internal cards in a fault tolerant configuration
- Nodes installed in SLOTS 1 and 2
- Virtual adapters set to Multiple Assignment
- Two virtual drives set to Full Access on SLOTS 1 and 2
The OS of the node in SLOT 1 shows more than the two disks assigned to it.
What should the engineer do to fix this issue?