1.
The time which results in the least possible construction cost of an activity, is known as
2.
The area under the Beta distribution curve is divided into two equal parts by
3.
The grade resistance factor for an earth moving machine can be obtained by multiplying grade percentage by a factor approximately equal to
4.
Which one of the following is not an excavating and moving type of equipment?