In an NC machining operation, the tool has to be moved from point (5, 4) to point (7, 2) along a circular path with centre at (5, 2). Before starting the operation, the tool is at (5, 4). The correct G and N codes for this motion are
The tool of an NC machine has to move along a circular arc from (5, 5) to (10, 10) while performing an operation. The centre of the arc is at (10, 5). Which one of the following NC tool path command performs the above mentioned operation?
Match the following:
advertisement
NC code Definition
P. M05 1. Absolute coordinate system
Q. G01 2. Dwell
R. G04 3. Spindle stop
S. G09 4. Linear interpolation