After a pre-installation walkthrough, the server technician concludes that the power outlets, rack dimensions,
physical security, and network cabling are all acceptable. However, one factor is missing in the pre-installation
planning, so the technician decides not to install the server in this location.
Which factor was not included in the pre-installation planning?
A company has 260 clients and one server. The server appears to be compromised by a security hole. The
operating system manufacturer has provided a security patch. Which two actions should be taken next? (Select
TWO)
A company implements a new policy requiring that all data stored on the servers, regardless of their RAID level,
be secured and locally accessible only to administrators. How does this affect the diagnostic partitions on the
servers?
The current data center has run out of space. A room that is located next to the existing data center is then
used to house two racks containing six servers. Six months later, physical housekeeping is performed as part
of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?
During the installation of a new server, the following actions are performed:
Server hardware components are inventoried.
The latest BIOS and firmware are downloaded and applied. The network operating system and patches are
loaded.
The after-market tape drive attached to the server fails to initialize. Which of the following is the MOST likely
cause of the failure?
Replacing an existing controller with a newer controller that may have different PCI resource requirements (e.g.
CHs, F/W) is an example of which type of hot plug technology?