1.
A high-volume enterprise contract management system requires a central site with 14 remote sites. The remote sites have fixed, limited bandwidth connections with the central site, and retrieval volumes will be high. The BEST solution would be for the customer to deploy the central site and:
2.
User interfaces for a Document Management System (DMS) can include which of the following?
3.
During the project planning phase, it is essential for the consultant to obtain which one of the following?
4.
A procedure that allows for the control of the project scope with respect to proposed changes to the plan is known as a:
5.
Which group of people is BEST suited for system acceptance testing?
6.
A scope of work should include which one of the following items?
7.
While validating requirements, it becomes apparent that multiple solutions could fit the customers needs. The consultant should:
8.
Certkiller .com hires a consultant to document and automate existing operational processes. The project sponsor indicates that the company intends to keep staffing levels constant as a result of the effort and to promote the best people from operations and train them to be internal auditors. During requirements gathering, most employees decline to help the consultant. Which of the following should the consultant do?
9.
Which of the following is the MOST important item when presenting a solution design to Certkiller .com for review?
10.
Scope creep can often occur when: