You are connecting a new switch to an existing two switch Fabric with domain IDs of 1 and 2. The new switch has a domain ID of 1. The principal switch of the existing fabric has a principal switch priority of 10 and is
Domain 1. The new switch has a principal switch priority of 1 configured and has the lowest switch WWN of all 3 switches.
What switch will be the principal switch after the new switch is added?
Two switches are merging together. During principal switch selection, Switch A sends a frame indicating it has an empty domain ID list. Switch B sends a frame indicating that there are previously allocated domain IDs.
Switch A has a lower priority value and a lower WWN. What should occur next?