1.
In order to create a DCC tunnel in the ONS 15454, which TWO statements are necessary conditions?
1. LDCC tunnels need to be available.
2. The OC-N port where the DCC will be tunneled needs to be enabled.
3. A customer circuit must be provisioned first.
4. Only Ports 1&3 of the OC-3 card can tunnel DCC.
5. SDCC needs to be tunneled separately for transmit and receive directions
2.
What is a reason for using amplifiers with more than one stage?
3.
Which can be defined as the mean optical power required to obtain a required BER at a given bit rate?
4.
What is the purpose of Dual Ring Interconnect in SONET rings?
5.
Why is it important to leave some residual dispersion at an amplifier site when 10Gb/s signals in a DWDM system have gone through a dispersion compensating device?
6.
What SAN topology has the ability to scale to very large networks?
7.
RPR capability on the ML-series cards increases the scalability of the ML architecture from 10 cards per ring to how many cards per ring?
8.
What establishes routing table precedence in a routing table?
9.
You have an E-series shared packet ring of size STS-3c consisting of ONS 15454 nodes. What is the maximum size point-to-point circuit that can be configured with the remaining bandwidth to the multi-card
Ethernet group on the E-series cards?
10.
What CiscoWorks 2000 application provides support for optical NEs?