Consider four software upgrade events on an Ethernet Routing Switch (ERS) 2500 series switch:
1. Upgrade the software image
2. The System Reboots
3. Backup the binary configuration to a TFTP server
4. Upgrade the boot/diagnostic code, if the new version is available
Which sequence of events will correctly upgrade the software?
A technician has complied me configuration of an Ethernet Routing (ERS) 5520 to and now must transfer a
backup copy of configuration file to server. Which command is used to accomplish this task?
A technician has implemented RSMLT edge design. After recovering from power outage some clients could
not communicate. It has been stated that only one of the core RSMLT switches has recovered. What
should have been done to prevent the loss of communications?
A technician has installed a license file on the Ethernet routing switch (ERS) 8800 and rebooted, but cannot
configure the associated licensed features. it has been determined that license did not load properly at
bootup time. Which two must be verified?
One of the switches in the Ethernet Routing Switch (ERS) stacks files and is replaced. The auto unit
replacement (AUR) is enabled but the stack is not functioning properly. What is the problem?
A technician needs to reboot an Ethernet Routing Switch (ERS) 5000 Series switch with a default
configuration. What needs to be done to keep the IP address and stack license?
A customer needs to install a new Ethernet Routing Switch (ERS) 2550T on the 172.16.5.0/24 network, but
does not have a console cable available. Which statement is correct?