1.
What causes the heat island effect?
2.
What is the first step in the commissioning process?
3.
The Carpet and Rug Institute's Green Label Plus Certification program certifies what type of building material?
4.
Which of the following projects would definitely not meet the Minimum Program Requirements (MPRs) for a LEED project?
5.
Which standard sets VOC limits for commercial interior paints?
6.
At what point in a project should integrated design meetings begin?
7.
For LEED purposes, what sets the guidelines for measurement and verification of a building's systems?
8.
A project team is planning on reusing an existing elevator in a renovation project. What LEED area would reusing the elevator contribute to?
9.
To which of the following LEED credit are is the Advanced Buildings Core Performance Guide related?
10.
Which of the following is NOT considered a process load?