Senior Calibration Engineer Perfect Gears (chennai) pvt ltd

  • company name Perfect Gears (chennai) pvt ltd
  • working location Office Location
  • job type Full Time

Experience: 1 - 1 years required

Pay:

Salary Information not included

Type: Full Time

Location: All India

Skills: Calibration, Micrometer, Vernier Caliper, Profile Projector, Roughness Tester, Hardness Tester, MSA Study, Equipment Maintenance, ISO Standards, instruments, Gauges Verification, Calibration Reports Preparation, Jigs fixtures, Plug Gauge, Snap Gauge, Receiver Gauge, Ring Gauge, Air Ring Gauge, Master Gear Inspection, 2D Height Gauge, SAP Handling, drawing study, GDT Knowledge, Gauge planning, Excel Sheet Preparation, New Equipment Purchasing, Enquiry Handling, PRS Preparation, PO Followup, External Calibration Arrangements, AMC Arrangement, Courier Arrangement, Component Master Preparation, Roll Test Mandrel, Taper Plug Gauge Inspection, Ring Gauge Inspection, Sine Bar, Sine Centre, Web Development

About Perfect Gears (chennai) Pvt Ltd

Job Description

Roles & Responsibilities Calibration 1) Verification of all instruments and gauges calibration status in ACECMS software. 2) Instruments and gauges collection from all plants (PG1, PG2, PVEE, ANNEX) and supplier end. 3) Calibration reports preparation and upload in software for all instruments &gauges. 4) Instruments and gauges issue to all plants and supplier end. 5) Calibration issue, details update in software for all instruments and gauges. 6) All instruments like Micrometer, verniercaliper, Jigs & Fixtures, Plug gauge, Snap gauge, Receiver gauge,Ring gauge Air ring gauge and master gear inspection. 7) Handling of 2D height gauge, Profile projector, Roughness tester and Hardness tester. 8) Micrometer and Plunger dial - Service and error correction. 9) Drawing study & GD&T knowledge. 10) SAP handling codes - QA32, MMBE, MB51, ME2L, ME23N,CO11,ZSTOCK,QP01,COOIS,MM03,ZISSUES 11) Mail follow up for all new equipments and gauges. 12) Gauge planning for all new developmentparts & Excel sheet preparation. 13) New equipment purchasing includingEnquiry from supplier, PRS preparation with approved with top management. PO followup& verification PO mail send to supplier end. 14) External calibration arrangements and verification of reports. 15) AMC arrangement for 2D, profile projector, Hardness tester, Air gauge & Multigauge. 16) Courier arrangement for gauge, fixture component as per instruction of Mr.Ravi sir. 17) Component master preparation - OPD,Span, OD, ID, Roll test mandrel. 18) Roll test mandrel and Bunk - Drawing preparation. 19) Taper plug and Ring gauge inspection with sine bar , sine centre. 20) Inspection and gauges equipment maintenance on daily basis. 21) MSA study as per the plan. 22) Calibration report filing & File arrangement. 23) Daily basis Room temperature, Humidity checks sheet updating. 24) All equipment number issuing & engraving Gauge excel list entry. 25) Prepare all records and Documents as per ISO & IATF standards. 26) Attend the New product development meeting for new gauge procurements. 27) Prepare all calibration stickers with due date and pasting on each instrument. 28) Coordinating with customer for inspection of new parts, Customer audit attend 29) Inspection work FMC all parts (Stage to Final inspection) 30) Inspection work - SAME Bevel gear Teeth cutting - Final inspection. Job Types: Full-time, Permanent Benefits: Provident Fund Schedule: Day shift Evening shift Morning shift Night shift Rotational shift Performance bonus Yearly bonus Experience: total work: 1 year (Preferred) Work Location: In person Application Deadline: 31/08/2024 Expected Start Date: 07/08/2024,